Boston Landmarks Commission Hearing 02/26/2019
The commission will hold its monthly design review public hearing on Tuesday, February 26, 2019.
USE CONGRESS STREET AS AN ENTRANCE/EXIT AFTER 5:30 P.M.
Discussion Topics
-
Design Review - 4:00 PM
19.585.74A/75 5-9 Broad Street (Continued)
Applicant: Matt Austin, 9 Broad Street, LLC
Proposed work: Storefront and alley façade rehabilitation19.688.122 First Church in Roxbury
Applicant: Rev. Mary Margaret Earl, Executive Director
Proposed work: Restoration of west entry, landscaping and paving19.263.142 Emerald Necklace (Continued)
Applicant: Margaret Dyson, BPRD
Proposed work: Phase 2 of Muddy River Flood Damage Reduction Project19.801.2 Armory of the First Corps Cadets
Applicant: Guy Grassi, Grassi Design Group
Proposed work: Installation of new canopy, entry door, railing system, and carpet19.706.66 Blackstone Block
Applicant: Debra Kessler
Proposed work: Installation of façade lighting19.799/800.250 Winthrop-Carter Building
Applicant: Amgad Hanna, Mega Mobile
Proposed work: Installation of signage -
Administrative Review/Approval
19.715.66 Blackstone Block
Applicant: Ryan Lynch, New Cingular Wireless PCS, LLC
Proposed work: Installation of antennas19.720.223 Christian Science Complex
Applicant: Brooke Ten Eyck, First Church of Christ
Proposed work: Extension to 17.810.223, renovation of Mother Church and Extension facades19.735.50 Stock Exchange Building, 53 State Street
Applicant: Jason Bansfield, Newmark Knight Frank
Proposed work: Installation of sign on non-historic ramp19.763.BSR/BBW Deerfield Street near BU Yawkey Center
Applicant: Joseph Shannon, Crown Castle
Proposed work: Replacement of light post and installation of DAS node19.764.BSR/BBW 113 Back Street
Applicant: Joseph Shannon, Crown Castle
Proposed work: Replacement of light post and installation of DAS node19.765.BSR/BBW 67 Back Street
Applicant: Joseph Shannon, Crown Castle
Proposed work: Replacement of light post and installation of DAS node19.766.BSR/BBW 199-201 Bay State Road
Applicant: Joseph Shannon, Crown Castle
Proposed work: Replacement of light post and installation of DAS node19.767.BSR/BBW 10 Kenmore Street
Applicant: Joseph Shannon, Crown Castle
Proposed work: Replacement of light post and installation of DAS node19.768.BSR/BBW 152 Bay State Road and Silber Way
Applicant: Joseph Shannon, Crown Castle
Proposed work: Replacement of light post and installation of DAS node19.792.04 Boston Common Frog Pond
Applicant: John Schaub, General Manager
Proposed work: Temporary installation of carousel and ticket booth between parade ground and Frog Pond19.793.04 Boston Common Frog Pond
Applicant: John Schaub, General Manager
Proposed work: Temporary installation of bistro tables, chairs, and planters at the Frog Pond Pavilion19.794.04 Boston Common Brewer Fountain
Applicant: John Schaub, General Manager
Proposed work: Temporary installation of bistro tables, chairs and umbrellas at Brewer Fountain -
Business Hearing - 6:00 PM
1. Discussion and vote on Design Review Applications
2. Review and ratification of meeting minutes from 02/12/2019.
3. Discussion and vote on the National Register nomination for the Nathan Warmick Apartments, 57 Bicknell Street, Dorchester, MA
4. Updates
- Projected Adjournment - 7:00 PM