Boston Landmarks Commission Hearing 10/24/2017
The commission will hold its monthly public design review hearing on Tuesday, October 24, 2017.
USE CONGRESS STREET AS AN ENTRANCE/EXIT AFTER 5:30 P.M.
Discussion Topics
-
Design Review - 5:00 p.m.
18.147.86 Colonial Theatre
Applicant: Jeffrey Ganem, Tenant Representative, Leggat McCall Properties LLC
Proposed work: Renovation of auditorium balcony to meet accessibility guidelines18.445.184 Fenway Park
Applicant: David Friedman, SVP Legal and Government Affairs
Proposed work: Installation of new group seating near first base dugout; expansion of left field seating18.412.SB 131 Saint Botolph Street
Applicant: Stefano Efstratoudakis, Drachma Realy Trust
Proposed work: Replacement of windows; façade maintenance and restoration18.414.SB 117 Saint Botolph Street
Applicant: Alice, Stein, Skyline Realty
Proposed work: Replacement of roof deck; renovation of roof, chimney, drainage, and electrical system; installation of headhouse canopy18.292.90 Five Clocks (9 Chelsea Street, East Boston)
Item Removed at Applicant’s Request (Tentatively Rescheduled for 11/28)Applicant: Richard Lynds, Attorney, Linear Realty
Proposed work: Relocation of Historic Clock from Maverick Square to Central Square in East Boston (continued from earlier hearing date) -
Administrative Review/Approval
► Applicants whose projects are listed under this heading NEED NOT APPEAR at the hearing. Please see agenda for details. If you have any questions, please contact staff at 617-635-3850 or BLC@boston.gov.
18.244.16 Blackstone Block (Casalinga)
Applicant: Robert Santini, Owner of Casalinga
Proposed work: Installation of Casalinga Signage18.346.35 Charlestown Savings Bank (T-Mobile)
Applicant: Dan Glissman
Proposed work: Replacement of existing faux chimney and installation of antennas in chimney18.409.214 Blessed Sacrament Complex
Applicant: Luis Ottonelli
Proposed work: Replacement in kind of existing first floor windows18.419.82 25-27 India Street (Coogan’s Restaurant)
Applicant: Paul Wilson, Director of Operations
Proposed work: Installation of interior accessibility ramp18.388.MHT 19 Wigglesworth St.
Applicant: Joyce McDara, Contractor
Proposed work: Removal of existing shingles and installation of slate roof, copper gutter, downspout, and new corbels.18.389.MHT 21 Wigglesworth St.
Applicant: Joyce McDara, Contractor
Proposed work: Removal of existing shingles and installation of slate roof, copper gutter, downspout, and new corbels.18.408.SB 67 Saint Botolph Street
Applicant: Guy Grassi, Grassi Design Group
Proposed work: Replacement of aluminum windows with wood windows; façade maintenance and restoration -
Business Hearing - 6:00 PM
1. Discussion and Vote on Design Review Applications
2. Review and ratification of 09/26/2017 meeting minutes
3. Property Updates and Staff Reports
- Projected Adjournment - 6:30 PM