Boston Landmarks Commission Hearing 01/22/2019
The commission will hold its monthly design review public hearing on Tuesday, January 22, 2019.
USE CONGRESS STREET AS AN ENTRANCE/EXIT AFTER 5:30 P.M.
Discussion Topics
-
Design Review - 3:30 PM
19.661.143 Batterymarch Building
Applicant: Mevzad Kurakovic, MNM Restaurant Group
Proposed work: Installation of Tradesman signage19.668.49 Church Green Buildings
Applicant: Lauren Cronin, Viewpoint Sign & Awning
Proposed work: Replacement of Dunkin Donuts signage19.696.235 New England Telephone Building
Applicant: Thomas O’Connor, Property Manager
Proposed work: Installation of roof deck at sixth floor19.688.122 First Church in Roxbury
Applicant: Rev. Mary Margaret Earl, Executive Director
Proposed work: Restoration of west entry, landscaping and paving19.585.74A/75 5-9 Broad Street (Continued)
Applicant: Matt Austin, 9 Broad Street, LLC
Proposed work: Storefront and alley façade rehabilitation19.010.26/19.443.26/19.548.26 Federal Reserve Building (Continued)
Applicant: Richard Bussiere, The Langham Hotel
Proposed work: Installation of new canopies, awnings, signage, and ramp19.263.142 Emerald Necklace (Continued)
Applicant: Margaret Dyson, BPRD
Proposed work: Phase 2 of Muddy River Flood Damage Reduction Project -
Administrative Review/Approval
19.580.MHT 10 Worthington Street
Applicant: Gary and Cindy Walling
Proposed work: Replacement of four vinyl windows with wood windows19.640.42 Franklin Park
Applicant: Jennifer Golden, Operations Manager, Zoo New England
Proposed work: Replacement of roofing on zoo gift shop19.662.SB 193 St. Botolph Street
Applicant: Antonio Misdea, Misdea Enterprises LLC
Proposed work: Repointing of front and rear facades19.671.116 Board of Trade Building
Applicant: Michael LeBlanc, Utile
Proposed work: Replacement of two aluminum doors with two wood windows19.673.42 Franklin Park
Applicant: Jennifer Golden, Operations Manager, Zoo New England
Proposed work: Replacement of roofing on zebra barn19.689.SB 108 St. Botolph Street
Applicant: Eddie O’Connell, O’Connell Design Build Ltd.
Proposed work: Installation of new vestibule entry doors and intercom system19.697.109 Trinity Church
Applicant: Jeffrey Ganem, Owner’s Representative
Proposed work: Replacement of nine lighting rigs in the sanctuary19.716.224 Boston City Hall
Applicant: Gregory Rideout, Boston Public Facilities Department
Proposed work: Replacement of rooftop mechanical units -
Business Hearing - 6:00 PM
1. Discussion and vote on Design Review Applications
2. Review and ratification of meeting minutes from 12/11/2018
3. Archaeological presentation on the historic resources of the Harbor Islands
4. 2019 Work Plan
5. Updates