Boston Landmarks Commission Hearing 4/24/2018
The commission will hold its monthly public design review hearing on Tuesday, April 24, 2018.
USE CONGRESS STREET AS AN ENTRANCE/EXIT AFTER 5:30 P.M.
Discussion Topics
-
Design Review - 4:30 p.m.
18. 1109.217 Fowler Clark Epstein Farm
Applicant: Lisa Lewis, Project Manager
Proposed Work: Installation of signage, donor benches, and tool shed16.047.103 Quaker Lane
Applicant: Will Grosvenor, Related Beal
Proposed Work: Rehabilitation and Renovation of Quaker Lane
(continued from previous hearing)17.809.141 Sears Building (Landmark Center)
Applicant: Abe Menzin, SVP of Development
Proposed Work: Installation of kiosks and signage
(continued from previous hearing) -
Administrative Review/Approval
► Applicants whose projects are listed under this heading NEED NOT APPEAR at the hearing. Please see agenda for details. If you have any questions, please contact staff at 617-635-3850 or BLC@boston.gov.
18.989.SB 130 St. Botolph Street
Applicant: Tom Scolastico, Contractor
Proposed work: Repairs and restoration of masonry façade, metal details, and windows18. 1011.229 Charles River Esplanade
Applicant: Emily O’Connor
Proposed Work: Revision of previously approved Wayfinding Project18. 1012.142 Emerald Necklace
Applicant: Jeffrey Harris, Preservation Planner
Proposed Work: Plant and replant 76 trees18.1039.BSR 72 Bay State Road
Applicant: Juliana Silva
Proposed work: Façade washing and repointing18. 1094.241 Museum of Fine Art
Applicant: Patricia Palmiere, Contractor
Proposed Work: Installation of roof vents as part of interior renovation18. 1108.4 Boston Common
Applicant: John Donahue, Chief of Operations and Capital Projects
Proposed Work: Excavation of a test pit to investigate water leakage18. 1110.147 Copley Plaza (Fairmont Copley Hotel)
Applicant: Eric Ulvila, Director Engineer
Proposed Work: Replacement of 11 awnings18. 1114.52 United Shoe Machinery Building
Applicant: Anita Simon, Enclosure Consultant
Proposed Work: Façade exploratory openings -
Business Hearing - 6:00 PM
1. Discussion and Vote on Design Review Applications
2. Review and ratification of 04/10/2018 meeting minutes3. Vote to reconsider the Commission's decision to impose a two-year moratorium on construction at 144-146 Maverick Street in East Boston, in response to a request filed by Richard Lynds on behalf of Linear Realty
(continued from previous hearing)4. Updates
- Projected Adjournment - 7:00 PM