Boston Landmarks Commission Hearing 1/23/2018
The commission will hold its monthly public design review hearing on Tuesday, January 23, 2018.
USE CONGRESS STREET AS AN ENTRANCE/EXIT AFTER 5:30 P.M.
Discussion Topics
-
Design Review - 4:00 p.m.
18.721.1234 Commercial Wharf East (Boston Body Pilates)
Applicant: Clark Elefteriadis
Proposed work: Installation of Boston Body Pilates signage18.764.66 Blackstone Black (Captains of Industry)
Applicant: Ted Dillon
Proposed work: Installation of Captains of Industry signage18.721.12 Faneuil Hall
Applicant: Jim McGaffigan
Proposed work: Restoration of windows, doors, cornices, and tower18.794.86 Colonial Theatre
Applicant: Jeffrey Ganem, Tenant Representative, Ambassador Theatre Group
Proposed work: Replacement of Colonial Theatre marquee18.796.56/99 Back Bay Fens/Boston Public Library
Applicant: Ricardo M. Sousa, Esq., ExteNet Systems, Inc.
Proposed work: Installation of nine DAS Nodes along the Back Bay Fens and one adjacent to the Boston Public Library -
Administrative Review/Approval
► Applicants whose projects are listed under this heading NEED NOT APPEAR at the hearing. Please see agenda for details. If you have any questions, please contact staff at 617-635-3850 or BLC@boston.gov.
18. 712.32 20 Eustis Street
Applicant: Howard Stein Hudson
Proposed work: Reconstruction of Melnea Cass Boulevard (a segment of which is in the Eustis Street ACD protection area)18.737.176 Faneuil Hall
Applicant: Carlene, Laurent, Property Manager
Proposed work: Maintenance of wood flooring in the Great Hall18.739.108 Custom House
Applicant: Stephanie Sobeck Butera, Marriott Resorts
Proposed work: Replacement of Marriott signage18.745.7 Adams Nervine
Applicant: Gregory Caplan, Boston Building Resources
Proposed work: Installation of two storm windows18.746.BBW 464 Commonwealth Avenue (Boston Smoke Shop)
Applicant: Ricky Zeng, Sign Contractor
Proposed work: Installation of two wall signs18.774.66 Blackstone Block (Millennium Hotel)
Applicant: Jack Pilon, T-Mobile
Proposed work: Removal of three antennas and cables, and installation of three antennas and cables18.788.229 Charles River Esplanade
Applicant: Jeffrey Harris, Department of Recreation and Conservation
Proposed work: Removal of eight diseased trees, loaming and reseeding18.793.184 Fenway Park
Applicant: David Friedman
Proposed work: Replacement of right field Budweiser sign text with Samuel Adams text18.795.52 United Shoe Machinery
Applicant: Julie Reker, Architect
Proposed work: Interior Street Café modifications18.799.152 Ferdinand’s Blue Store (Bolling Building)
Applicant: Cheryl Straughter, Soleil
Proposed work: Replacement of Tasty Burger signage with Soleil signage -
Business Hearing - 6:00 PM
1. Discussion and Vote on Design Review Applications
2. Review and ratification of 01/09/2018 meeting minutes.
3. Property Updates and Staff Reports
- Projected Adjournment - 6:30 PM