Boston Landmarks Commission Hearing 8/22/2017
The commission will hold its monthly public design review hearing on Tuesday, August 22, 2017.
USE CONGRESS STREET AS AN ENTRANCE/EXIT AFTER 5:30 P.M.
Discussion Topics
-
Design Review - 4:00 p.m.
17.1515.214 Blessed Sacrament Church
Applicant: Richard Youngstrom, Artist
Proposed work: Temporary installation of mosaic art pieces onto planters18.147.86 Colonial Theatre
Applicant: Jeffrey Ganem, Tenant Representative, Leggat McCall Properties LLC
Proposed work: Replacement and restoration of auditorium seating; plaster and paint repairs; installation of new carpeting; cleaning, painting; installation of bars; accessibility improvements797-1.17368.11 Faneuil Hall Marketplace
Applicant: Joseph M. O’Malley, GM, Ashkenazy Acquisition Corporation
Proposed work: Installation of eight outdoor seating areas at Quincy Market, North Market and South Market buildings in Faneuil Hall Marketplace; Replacement of existing glass shed structures on Quincy Market -
Administrative Review/Approval
18. 118.91 Berkeley Building
Applicant: Kim Demelo, Contractor, Heritage Restoration, Inc.
Proposed work: Façade cleaning and window repairs18.024.187 Loring Greenough House
Applicant: Andrew Hatcher, Jamaica Plain Tuesday Club
Proposed work: extension of irrigation system to tennis courts18.153.147 Copley Plaza
Applicant: Chris Kelley, P.J. Spillane Company, Inc.
Proposed work: Targeted façade repairs related to waterproofing and masonry stabilization on Trinity Place, St. James Ave. and Dartmouth Street facades(The following have been administratively approved for the St. Botolph Architectural Conservation District)
17.1497.SB 9 Harcourt Street #503
Applicant: Mark V. and Lori A. Roux, owners
Proposed work: Replace three non-historic windows with double-hung windows18.066.SB 16 St. Botolph
Applicant: Anthony Canagh, Contractor
Proposed work: Repair brick and mortar on facade18.019.SB 12 Cumberland Street Apt. 2
Applicant: Anthony Griseto, Salesman, Pella Windows and Doors
Proposed work: Replace 11 vinyl windows with 11 wood clad windows to match existing in color and grille pattern18.056.SB 187 St. Botolph Street
Applicant: Mark Jordan, Contractor
Proposed work: Install EPDM roof, repair skylights, replace copper gutters and downspouts, install copper edge metal, and replace all metal on lower roof with copper -
Business Hearing - 6:00 PM
1. Discussion and Vote on Design Review Applications
2. Review and ratification of 08/08/2017 meeting minutes3. Demolition Delay Hearing: 88 Lambert Avenue, Roxbury, MA
Application #18.085D2224
Applicant: Robert Patton Spruill
Re: Review of proposed demolition of a five garage structures at 88 Lambert Ave., Roxbury, MA4. Demolition Delay Hearing: 144-146 Maverick Street, East Boston, MA
Application #18.096D2227
Applicant: Richard C. Lynds, Esq.
Re: Review of proposed demolition of two three-story townhouses at 144 and 146 Maverick Street, East Boston, MA5. Property Updates and Staff Reports
- Projected Adjournment - 8:30 PM