Boston Landmarks Commission Hearing 2/28/2017
The commission will hold its monthly public design review hearing on Tuesday, February 28, 2017.
USE CONGRESS STREET AS AN ENTRANCE/EXIT AFTER 5:30 P.M.
Discussion Topics
-
Design Review - 3 p.m.
17.431.229 Charles River Esplanade (Lederman Memorial)
Applicant: Ruth Helfeld, DCR Section Head
Proposed work: Construction of Lederman Memorial and landscaping; applicant is returning for follow-up from a previous hearing17.705.245 Harvard Medical School
Applicant: Meaghan Doyle, Planner, Harvard University Medical School
Proposed Work: Installation of new ADA-compliant ramps around the campus quadrangle; applicant is returning for follow-up from a previous hearing17.806.35 Charlestown Savings Bank (Cambridge Savings Bank)
Applicant: Daniel E. Fraine, Senior VP
Proposed Work: Installation of Cambridge Savings Bank Signage on front and side facades17.805.35 Charlestown Savings Bank (Starbucks)
Applicant: Daniel Brennan, Expeditor
Proposed Work: install signage on awnings and window decal; installation of patio railing with planter boxes, and new patio furniture; refurbish flag pole and add Starbucks flag17.809.141 Sears Building (Landmark Center)
Applicant: Abe Menzin, SVP of Development
Proposed Work: landscaping and public realm improvements; interior and exterior building modifications, including the installation of new windows, steel surrounds, and canopies; applicant is returning for follow-up from a previous hearing17.724.217 Fowler Clark Epstein Farm
Applicant: Lisa Lewis, Project Manager
Proposed Work: Removal and replacement of siding; replacement of windows; restoration of portico; new doors, shutters, fixtures; etc.17.810.223 Christian Science Complex (The Mother Church Original and Extension Edifices)
Applicant: Brooke E. Ten Eyck, Project Manager
Proposed Work: Stone façade repairs, rebuild balustrades; install protective glazing; replace roof; replace terra cotta -
Administrative Review/Approval
► Applicants whose projects are listed under this heading NEED NOT APPEAR at the hearing. Please see agenda for details. If you have any questions, please contact staff at 617-635-3850 or BLC@boston.gov.
17.724.217 United Shoe Machinery Building
Applicant: Siena Construction, General Contractor
Proposed Work: Replace ATM and equipment, granite floors and millwork in lobby alcoveApplication: 17.733.60 Omni Parker House Hotel
Applicant: Chris Kelley, Contractor
Proposed Work: replace corroded steel and flashing; cleaning and coating stucco; isolated repairs of brick masonry and mortar jointsApplication: 17.779.04 Boston Common Brewer Fountain
Applicant: John Schaub, General Manager
Proposed Work: temporary installation of bistro tables and chairs and umbrella at Brewer FountainApplication: 17.780.04 Boston Common Frog Pond
Applicant: John Schaub, General Manager
Proposed work: temporary installation of carousel and ticket booth between parade ground and Frog PondApplication: 17.781.04 Boston Common Frog Pond
Applicant: John Schaub, General Manager
Proposed work: temporary installation of bistro tables, chairs, and planters at the Frog Pond PavilionApplication: 17.807.230 Isabella Stewart Gardner Museum
Applicant: Michael Holland, Director of Facilities
Proposed Work: repair and restoration of windows, restoration of balustrades, repointing of chimney, stucco repairs, new roof underlayment, painting and conservation of a plaque on east and west facades17.811.114 Ames Building (Cultivar)
Applicant: Mary Dumont, Lessee
Proposed Work: Installation of storefronts to match existing and work previously approved by BLC -
Business Hearing - 6:00 PM
1. Discussion and Vote on Design Review Applications
2. Review and ratification of 01/24/2017 meeting minute
3. Demolition Delay Hearing: 641 Baker St./990 LaGrange St., West Roxbury, Mass.
Application #17.393D2125
Review of proposed demolition of a barn at 641 Baker Street, West Roxbury, Massachusetts4. Property Updates and Staff Reports
- Projected Adjournment - 7:15 p.m.