St. Botolph Area Architectural Conservation District Commission hearing
The commission will hold its monthly public hearing on Wednesday, July 18, 2018.
(After 5:30 p.m. use Congress Street as an entrance and exit.)
Discussion Topics
-
Design Review
18.1517 SB 162 St. Botolph Street
Applicant: Katherine Cipriani, GTI Properties
Proposed Work: Replace handrail at front steps; repair and repaint holes in front steps.
18.1516 SB 164 St. Botolph Street
Applicant: Katherine Cipriani, GTI Properties
Proposed Work: Replace handrail at front steps; repair and repaint holes in front steps.
18.1515 SB 166 St. Botolph Street
Applicant: Katherine Cipriani, GTI Properties
Proposed Work: Replace handrail at front steps; repair and repaint holes in front steps.
18.1514 SB 172 St. Botolph Street
Applicant: Katherine Cipriani, GTI Properties
Proposed Work: Replace handrail at front steps; repair and repaint holes in front steps.
18.1513 SB 174 St. Botolph Street
Applicant: Katherine Cipriani, GTI Properties
Proposed Work: Replace handrail at front steps; repair and repaint holes in front steps.
18.1212 SB 258 West Newton Street
Applicant: Mark Van Brocklin, Embarc Studio
Proposed Work: Remove chimney on rear elevation; construct roof deck; restoration of side chimney detailing; restoration of oriel at side elevation.
18.1520 SB 27 Cumberland Street
Applicant: Mark Van Brocklin, Embarc Studio
Proposed Work: Replace all windows on front elevation with wood 1/1 double-hung windows; replace all windows on rear elevation with aluminum-clad windows; alter openings on rear elevation; replace garden fence and stoop rail; construct roof deck; construct cantilevered deck and staircase at 2nd story at rear yard; construct cedar fence at rear yard with rear gates; install pavers at rear yard.
-
Administrative Review/Approval
18.1534 SB 10-12 Cumberland Street: Repoint front mortar joints along roofline to match existing; reset existing slate roof; install ice dams on roof.
18.1520 SB 27 Cumberland Street: Refinish and paint front doors and sidelights; repoint front and rear elevations to match existing; repair window sills and headers; repair cornice; repair curbing at front yard; replace existing gutters with copper gutter and downspout; repair fire balconies and paint; (see Design Review items above).
18.1531 SB 7 Durham Street: Repoint front façade with mortar to match existing.
- REVIEW and RATIFICATION OF June 20, 2018 PUBLIC HEARING MINUTES
- Staff Updates
- Adjourn