Public Improvement Commission Meeting

The Public Improvement Commission Meeting on May 9, 2024, at 10 a.m.

This Thursday's Public Improvement Commission hearing is scheduled for its regular time, 10 a.m.  Project teams and Commission members will be participating in this hearing primarily from remote locations. Hearing participants will be digitally connected in real time courtesy of the City’s Department of Innovation and Technology. Members of the public who wish to participate in the hearing are strongly encouraged to do so remotely; the hearing will continue to be televised and may also be streamed live online via Boston TV.  Those members of the public who are unable or choose not to participate remotely should report to City Hall room 801 at the time of the hearing.  Written testimony for all agenda items will continue to be accepted via email; written testimony should be directed to PIC@boston.gov

All project team members who intend to join their project's presentation, as well as any City staff representatives or members of the public who wish to participate remotely, should complete the registration form available online by Wednesday afternoon.

Discussion Topics

  1. Hearing Minutes

    HM 1.  At the request of the Public Improvement Commission staff, the Acceptance of the Minutes of the PIC hearing held on April 25, 2024.

  2. Public Hearing

    PH 1.  On a petition by FPG LaGrange Owner One LLC for the acceptance of a Pedestrian Easement adjacent to the following public ways in Boston Proper:

    • La Grange Street – on its northerly side generally at address nos. 47-55, east of Tamworth Street;

    • Tamworth Street – on its easterly side between La Grange Street and Lowell Court.

    (NB 4/25/2024) As shown on a plan entitled “City of Boston Public Works Department, Engineering Division, Pedestrian Easement Plan, 55 LaGrange Street, Boston,” 1 sheet dated July 16, 2020.

    PH 2.  On a petition by FPG LaGrange Owner One LLC for the making of Specific Repairs within the following public ways in Boston Proper:

    • La Grange Street – generally at address nos. 47-55, from Tremont Street to a point east of Tamworth Street;

    • Tamworth Street – generally between La Grange Street and Boylston Street;

    • Tremont Street – at La Grange Street;

    • Boylston Street – at Tamworth Street.

    (NB 4/25/2024) As shown on a set of plans entitled “City of Boston Public Works Department, Engineering Division, Specific Repairs Plan, 47-55 LaGrange Street, Downtown Boston,” 6 sheets dated January, 2024.

    PH 3. On a petition by Rina Enterprises Inc. for the making of Specific Repairs within Dudley Street (public way), Roxbury, located on its northerly side at address no. 190, generally west of Winslow Street.

    (NB 4/25/2024) As shown on a plan entitled “City of Boston Public Works Department, Engineering Division, Specific Repair Plan, Dudley Street, Roxbury, 190 Dudley Street,” 1 sheet dated March 29, 2024.

    PH 4.  On a petition by Holocaust Legacy Foundation for the Vertical Discontinuance of portions of Tremont Street (public way), Boston Proper, located on its southeasterly side at address no. 125 southwest of Hamilton Place, vertically above the grade of the sidewalk.

    (NB 4/25/2024) As shown on a set of plans entitled “City of Boston Public Works Department, Engineering Division, Vertical Discontinuance Plan, 125 Tremont Street, Boston Proper,” 2 sheets dated August 3, 2023.

    PH 5.  On a petition by Holocaust Legacy Foundation for the making of Specific Repairs within Tremont Street (public way), Boston Proper, located on its southeasterly side generally at address no. 125, southwest of Hamilton Place.

    (NB 4/25/2024) As shown on a set of plans entitled “City of Boston Public Works Department, Engineering Division, Specific Repairs Plan, 125 Tremont Street, Public Way, Boston,” 2 sheets dated April, 2024.