city_hall

Official websites use .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

A lock or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Last updated:

South End Landmark District Commission

The South End Landmark District Commission will hold its monthly public hearing on March 5, 2019, at 5:30 p.m.

After 5:30 p.m., please use Congress Street as an entrance and exit.

The public can offer testimony.

Discussion Topics

  1. VIOLATIONS

    VIO.19.029 SE                119 Pembroke Street: Ratification of unapproved work on windows on the front façade.

  2. DESIGN REVIEW

    APP #19.724 SE                29 Rutland Square (Previously Heard on 11/2018 & 1/2019) Proposed Work: At front façade levels G,1,2,3 replace 8 original (6 curved, 4 straight sash) wood, two over two windows and 2 non-original (Fl. G & 1) two over two, wood windows with wood, two over two windows (8 curved and 2 straight sash).

    APP # 19.702 SE           41 Worcester Square (Previously Heard on 1/2019) Proposed Work: At rear of the structure, install exhaust vent that rises above the mansard roof.

    APP # 19.597 SE           18 Holyoke Street Proposed Work: At front façade all levels replace 12 original wood, 2 over 2 windows with 12 wood, 2 over 2 wood windows.

    APP # 19.805 SE           157 West Canton Street Proposed Work: At front and side façade, all levels, replace six, 2 over 2, wood, bowed windows; seven, 2 over 2, wood windows, and two, 1 over 1, wood windows in kind.

    APP # 19.825 SE           28 Concord Square Proposed Work: Install Roof Deck (See Additional Items in Admin Review).

  3. ADMINISTRATIVE REVIEW

    APP # 19.730 SE           519 Albany Street Proposed Work: At roof level, add three panel antennas to existing configuration.

    APP # 19.727 SE           3 Bond Street Proposed Work: Remove and replace chimney in kind. At front façade, all levels, replace 6 over 6 windows with 2 over 2 windows

    APP # 19.775 SE           15A Cazenove Street Proposed Work: At front façade level 2, replace three non- historic, 2 over 2 wood, windows in kind. At garden level, replace 2 non-historic wood 2 over 2 windows in kind.

    APP # 19.831&2 SE       546 Columbus Ave #1 &2 Proposed Work: Repair fire escape.

    APP # 19.825 SE           28 Concord Square Proposed Work: At garden level reopen 1 existing light well, install double hung, 2 over 2, wood window in new egress window. At front façade, clean existing lintels and sills, paint with HC-69. (See Additional Items in Design Review).

    APP # 19.826 SE           88 Pembroke Street Proposed Work: Remove existing roof deck and railing, replace rubber roof, and reinstall roof deck in same location.

     

    APP # 19.726 SE           20 Rutland Street Proposed Work: At front façade, reconstruct front stoop in kind.

    APP # 19.820 SE           1 Saint Charles Street Proposed Work: At front façade, reconstruct stairs leading to basement, stairs at front landing in kind.

    APP # 19.745 SE           590 Tremont Street #2 Proposed Work: At front façade, repair moulding and trim of oriel in kind.

    APP # 19.822 SE           8 Yarmouth Street Proposed Work: At dormer level above door, replace one, non-historic, wood, 2 over 2 window with one, 2 over 2, wood window.

    APP # 19.827 SE           42 West Newton Street Proposed Work: At front façade level four, replace three non-historic, wood 2 over 2 windows in kind.

    APP # 19.821 SE            70 West Rutland Square Proposed Work: At front façade level 2, replace four, 1 over 1, aluminum clad windows, with two, 2 over 2, aluminum clad windows and two, 1 over 1, aluminum clad windows.

  4. RATIFICATION OF 2/5/2019 PUBLIC HEARING MINUTES & 01/22, 02/12, 02/19 subcommittee minutes.
  5. STAFF UPDATES
Back to top