South End Landmark District Commission
The South End Landmarks District Commission will hold its monthly public hearing on February 5, 2019, at 5:30 p.m.
Use Congress Street as an entrance and exit for City Hall after 5:30 p.m.
Discussion Topics
-
VIOLATIONS
VIO.19.027 SE 177 Warren Avenue: Ratification of unapproved painted slate on front mansard.
VIO.19.028 SE 172 West Brookline Street: Ratification of unapproved brownstone paint color.
VIO.19.029 SE 119 Pembroke Street: Ratification of unapproved work on windows on the front façade.
-
DESIGN REVIEW HEARING
APP # 19.654 SE 45 West Newton Street Proposed Work: (Continuation From 1/2019) at rear elevation dormer level, reduce the size of the existing dormer and construct a roof deck.
APP # 19.659 SE 73 Rutland Street Proposed Work: Rebuild roof deck.
APP #19.724 SE 29 Rutland Square (Previously Heard on 11/2018) Proposed Work: At front façade levels G,1,2,3 replace 8 original (6 curved, 4 straight sash) wood, two over two windows and 2 non-original (Fl. G & 1) two over two, wood windows with wood, two over two windows (8 curved and 2 straight sash).
APP #19.624 SE 615 Massachusetts Avenue Proposed Work: Install roof deck.
APP #19.675 SE 17 Claremont Park #2 Proposed Work: Alter existing roof deck.APP #19.693 SE 439-441 Tremont Street Proposed Work: At front façade street level, replace 4 existing signs and 2 awnings.
APP # 19.694 SE 484 Tremont Street Proposed Work: At front façade penthouse, replace 3 existing antennas, additional 3 surge arrestors and concealment shroud.
APP # 19.701 SE 715 Tremont Street Proposed Work: At front façade penthouse, install three additional panel antennas for a total of 12 antennas (including 9 that currently exist). Remove 3 remote radio units and replace with 12 units for a total of 21 (including 12 existing).
APP # 19.702 SE 41 Worcester Square Proposed Work: At rear of the structure, install exhaust vent that rises above the mansard.
APP #19.713 SE 205 W. Newton Street Proposed Work: Install roof deck.
APP # 19.716 SE 17 Cazenove Street Proposed Work: At front façade level one, replace two, wood, 1 over 1 windows with two, wood 2 over 2 windows.APP # 19.722 SE 40 Dartmouth Street Proposed Work: At front façade steps, install railing.
-
ADVISORY REVIEW
1767-1769 Washington St (Alexandra Hotel) Proposed Work: Restore façade of original structure; construct a new tower at the rear of the structure. -
ADMINISTRATIVE REVIEW/APPROVAL
APP # 19.718 SE 18 Appleton Street: At front façade garden level, replace 2, aluminum, 2 over 2 windows with wood 2 over 2 windows.
APP # 19.723 SE 52 Montgomery Street: Repoint front and rear facades in kind. Restore sills and lintels in kind.
APP # 19.721 SE 437 Shawmut Avenue: At street facing façade level 2, replace 3 non-historic wood 2 over 2 windows with 3 wood two over two windows.
- RATIFICATION OF 1/2/2019 PUBLIC HEARING MINUTES
- STAFF UPDATES