St. Botolph Area Architectural Conservation District Commission
The St. Botolph Area Architectural Conservation District Commission will hold a public hearing on Wednesday, December 19, at 5 p.m.
Use Congress Street as an entrance and exit for City Hall after 5:30 p.m.
Discussion Topics
-
VIOLATION
258 West Newton Street: Ratification of unapproved work at rear of the structure visible from a public way.
-
DESIGN REVIEW
19.378 SB 6-12 Blackwood Street Proposed Work: At rear of the structure replace existing windows with new fenestration. In all three light wells at the rear of the structure install decks and corresponding doors for each deck, repoint brick, and brick small windows.
19.281 SB 102 St. Botolph Street Proposed Work: At rear of the structure 1st floor, install 10’-0 wide glass door and 6’0 deep deck. Install penthouse setback from St. Botolph Street.
19.536 SB 117 St. Botolph Street Proposed Work: At rear of the structure construct 1 story carport over two existing parking spaces. Install roof deck on top of new carport. Replace two existing windows to create a door and sidelights for roof deck.
-
Administrative
19.588 SB 17 Durham Street #5 Proposed Work: At front, sides and rear facades of the structure, all levels, remove non-historic aluminum windows and replace with one over one aluminum clad windows.
- REVIEW and RATIFICATION OF October 17, 2018 PUBLIC HEARING MINUTES
- STAFF UPDATES