city_hall

Official websites use .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

A lock or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Last updated:

St. Botolph Area Architectural Conservation District Commission hearing

The commission will hold its monthly public hearing on Wednesday, July 18, 2018.

(After 5:30 p.m. use Congress Street as an entrance and exit.)

Public testimony begins at

Discussion Topics

  1. Design Review

    18.1517 SB 162 St. Botolph Street

    Applicant: Katherine Cipriani, GTI Properties

    Proposed Work: Replace handrail at front steps; repair and repaint holes in front steps.

     

    18.1516 SB 164 St. Botolph Street

    Applicant: Katherine Cipriani, GTI Properties

    Proposed Work: Replace handrail at front steps; repair and repaint holes in front steps.

     

    18.1515 SB 166 St. Botolph Street

    Applicant: Katherine Cipriani, GTI Properties

    Proposed Work: Replace handrail at front steps; repair and repaint holes in front steps.

     

    18.1514 SB 172 St. Botolph Street

    Applicant: Katherine Cipriani, GTI Properties

    Proposed Work: Replace handrail at front steps; repair and repaint holes in front steps.

     

    18.1513 SB 174 St. Botolph Street

    Applicant: Katherine Cipriani, GTI Properties

    Proposed Work: Replace handrail at front steps; repair and repaint holes in front steps.

     

    18.1212 SB  258 West Newton Street

    Applicant: Mark Van Brocklin, Embarc Studio

    Proposed Work: Remove chimney on rear elevation; construct roof deck; restoration of side chimney detailing; restoration of oriel at side elevation.

     

    18.1520 SB 27 Cumberland Street

    Applicant: Mark Van Brocklin, Embarc Studio

    Proposed Work: Replace all windows on front elevation with wood 1/1 double-hung windows; replace all windows on rear elevation with aluminum-clad windows; alter openings on rear elevation; replace garden fence and stoop rail; construct roof deck; construct cantilevered deck and staircase at 2nd story at rear yard; construct cedar fence at rear yard with rear gates; install pavers at rear yard.

  2. Administrative Review/Approval

    18.1534 SB     10-12 Cumberland Street: Repoint front mortar joints along roofline to match existing; reset existing slate roof; install ice dams on roof.

    18.1520 SB     27 Cumberland Street: Refinish and paint front doors and sidelights; repoint front and rear elevations to match existing; repair window sills and headers; repair cornice; repair curbing at front yard; replace existing gutters with copper gutter and downspout; repair fire balconies and paint;  (see Design Review items above).

    18.1531 SB     7 Durham Street: Repoint front façade with mortar to match existing.

  3. REVIEW and RATIFICATION OF June 20, 2018 PUBLIC HEARING MINUTES
  4. Staff Updates
  5. Adjourn
Back to top