Conservation Commission Hearing

The Conservation Commission will hold its next bi-weekly hearing on November 15, 2017 at 6 p.m.

In accordance with the Massachusetts Wetlands Protection Act, M.G.L. Chapter 131, Section 40, the Boston Conservation Commission will hold a public hearing in Boston City Hall, Piemonte Room, on November 15, 2017 to review the following projects to determine what conditions, if any, the Commission will impose in order to protect the interests of the public and private water supply, ground water, prevention of pollution, flood control, prevention of storm damage, protection of fisheries and land containing shellfish, and protection of wildlife habitat.

Discussion Topics

  1. Public Hearing 6 P.M.

    Notice of Intent for DEP File No. 006-1555 from Kyle Zick Landscape Architecture, Inc. on behalf of the Boston Parks and Recreation Department for improvements to the James P. Kelleher Rose Garden located at 73 Park Drive, Fenway, MA (BLSF). Continued from the November 1, 2017 hearing. 

    Notice of Intent for DEP File No. 006-15XX from VHB on behalf of Lena New Boston, LLC, for the Olmsted Green Mixed Income Rental Phase Project, part of a multiphase mixed-use development at Harvard and Morton Streets located in Mattapan, MA (ISLF)

  2. Public Meeting 6:45 P.M.

    Request for Determination of Applicability from the BSC Group on behalf of the Boston Parks and Recreation Department for the installation of 2 new floating docks and 5 new anchoring systems, located at Jamaica Pond, Jamaica Plain, MA. Continued from the November 1, 2017 meeting.  

    Request for Determination of Applicability from Massport for the proposed installation of a water service connection within Saratoga Street located in East Boston, MA 

    Request for Determination of Applicability from Nitsch Engineering on behalf of Equity Residential for the proposed residential apartment building located at 35 Lomasney Way, West End, MA 


    Request for a Certificate of Compliance for DEP File No. 006-0936 from the Boston Parks and Recreation Department, for the Belle Isle Coastal Preserve Project in East Boston, MA. Continued from the November 1, 2017 meeting. 

    Request for a Certificate of Compliance for DEP File No. 006-1096 from UMass Boston for the replacement parking facilities project on the UMass Boston campus, Dorchester, MA 

    Request for a Certificate of Compliance for DEP File No. 006-1342 from UMass Boston for shoreline stabilization and Harborwalk upgrades on the UMass Boston campus, Dorchester, MA 

    Request for a Certificate of Compliance for DEP File No. 006-1357 from UMass Boston for bayside parking automation upgrades located on the UMass Boston campus, Dorchester, MA 

    Request for a Certificate of Compliance for DEP File No. 006-0845 from UMass Boston for a new campus center located on the UMass Boston campus, Dorchester, MA 

    Request for a Certificate of Compliance for DEP File No. 006-1314 from Coastal Marine Management for the work completed at Pier 2 for the fender pile systems located in East Boston, MA 

    Request for a Certificate of Compliance for DEP File No. 006-1324 from Coastal Marine Management for the deck replacement at the Boston Harbor Shipyard located in East Boston, MA 

    Request for a Certificate of Compliance for DEP File No. 006-1355 from Coastal Marine Management for the relieving platform repair at Pier 2 located in East Boston, MA 

    Request for a Certificate of Compliance for DEP File No. 006-1450 from Coastal Marine Management for the repair to the relieving platform between Piers 1 and 2 located in East Boston, MA 

    Acceptance of the Order of Conditions:

    Notice of Intent for DEP File No. 006-1557 from Epsilon Associates, Inc. on behalf of Eversource Energy for the installation of an overhead transmission line for the West Roxbury to Needham Reliability Project located in West Roxbury, MA (BLSF, BVW, Bank, Riverfront)

    Acceptance of Meeting Minutes from November 1, 2017

    Sign Language interpreters are available upon prior request.  The Commission will hold a public meeting immediately following the last hearing or as appropriate following any hearing.  Plans and filings with the Commission may be viewed at the Environment Department, Boston City Hall, Room 709, from 8 AM to 4 PM Monday through Friday.  For more information, call 617-635-3850.


    Amelia Croteau 
    Boston Conservation Commission

Back to top