Discussion Topics
-
VIOLATIONS
APP # 23.0439 SE 427 SHAWMUT AVENUE
Applicant: William Duffy
Proposed Work: Paint existing railings, window sills, door to match existing; remove paint from existing granite.
APP # 23.0518 SE 137 WEST NEWTON STREET
Applicant: Joe Holland
Proposed Work: Install fire department strobe and bell in front of building.
-
DESIGN REVIEW HEARING
APP # 23.0532 SE 82 WALTHAM STREET
Applicant: Remi Albouy
Proposed Work: Replace existing non-original door with new.
APP # 23.0549 SE 46 MONTGOMERY STREET
Applicant: Zachary Millay
Proposed Work: Remove existing roof deck and replace with new roof deck, with new railings to be painted black; replace existing shingles with new; install fire safety equipment (fire alarm bell); remove and replace street entrance door; replace front railing. See additional items under administrative review.
APP # 23.0539 SE 55-57 TRAVELER STREET
Applicant: John Moran
Proposed Work: Install on roof 2 antenna arrays-Beta & Gamma sectors mounted on ballasts, RRHs, OVP & cables and 2 antenna array- Alpha & Delta sectors on façade; equipment & battery cabinets & transformer in
electrical room on 11th floor.
APP # 23.0536 SE 1750 WASHINGTON STREET
Applicant: Derek Rubinoff
Proposed Work: Reconfigure existing ground floor entry to conform to 521 CMR and ADA standards.
APP # 22.1118 SE 321-323 COLUMBUS AVENUE
Applicant: Hezekiah Pratt
Proposed Work: Remove existing windows and install new aluminum windows with arched headers at both bays; remove existing windows at brick facade and install new aluminum windows with arched headers; remove deteriorated metal cladding at both bays and install new prefinished metal cladding; restore two existing wood entrance doors; remove deteriorated storefronts and install new aluminum prefinished storefronts; remove deteriorated first floor cladding and install new granite panels.
- ADMINISTRATIVE REVIEW/APPROVAL
- RATIFICATION OF 1/3/2023 PUBLIC HEARING MINUTES AND 1/25/23 SUBCOMMITTEE MINUTES
- STAFF UPDATES
- PROJECTED ADJOURNMENT: 9:00 PM