Boston Nature Center Wetland and Stream Restoration
The City of Boston, Mass Audubon, Charles River Watershed Association, and the Boston Water and Sewer Commission are partnering on the ecological restoration of Canterbury Brook and its wetlands at the Boston Nature Center and neighboring, state-owned land.
Project Phase
Project Information
This collaborative effort advances a major, long awaited ecological restoration of Canterbury Brook and its wetlands at the Boston Nature Center—Mass Audubon’s 67-acre urban wildlife sanctuary in the heart of Mattapan—and an adjacent, state-owned parcel. Canterbury Brook, disconnected from the wetlands for over a century, is in a severely degraded state. Supported by two years of Municipal Vulnerability Preparedness (MVP) Action Grant funding, the project brings together community members, environmental justice partners, and technical experts to heal an important yet overlooked freshwater ecosystem.
UPCOMING PUBLIC MEETING
Join the City of Boston, Mass Audubon, CRWA, and BWSC on Thursday, December 3rd at 6PM for a virtual community meeting about the Canterbury Brook Restoration Project at the Boston Nature Center in Mattapan! See the early conceptual design plans and learn about the next steps as we shape this project.
SITE HISTORY
While Canterbury Brook was historically integrated into an expansive wetland covering the site, beginning in the 1800s the wetland was gradually drained into the brook, to allow farming and other development of the land. In the early 1900s, this stretch of the brook was placed within a stone-lined channel, further isolating it from remaining wetlands.
Today, the Canterbury Brook watershed has its origins near Codman Square, where the brook travels underground in stormwater pipes through Dorchester and Mattapan before surfacing north of Harvard Street at Hansborough Street, within State-owned land, referred to as Canterbury Brookside. After traveling north along this parcel, the brook turns west, crossing under Morton Street and into the Boston Nature Center sanctuary (owned and operated by Mass Audubon). Almost 3,000 feet of the brook is daylighted within Canterbury Brookside and the Boston Nature Center; it is one of few above-ground streams in Boston. Canterbury Brook is a tributary of Stony Brook, which is a fully underground tributary of the Charles River.
Downstream of the Boston Nature Center, the brook crosses under American Legion Highway, moves west across a variety of parcels before it goes underground again near Canterbury Street and continues to Stony Brook. With much of its length underground, many are not even aware that the Brook exists. Water regularly backs up at low-lying culverts, causing flooding at the Boston Nature Center, on Morton Street, and in surrounding areas. Litter and debris carried by the storm drains accumulate along the brook and wash deep into the wetlands during storms. Eroding streambanks undermine trees, reduce canopy cover, and degrade habitat. Poor water quality and sediment loads contribute to stress on downstream waterways, including the Charles River. Extreme rain events—now more common due to climate change—exacerbate all of these issues. As a result, Mattapan residents see litter, sediment buildup, invasive plants, eroded banks, and episodic flooding, rather than experiencing a wondrous natural area teeming with wildlife and biodiversity.
ABOUT THE PROJECT
In 2024, the City of Boston, Mass Audubon, the Charles River Watershed Association (CRWA), and the Boston Water and Sewer Commission (BWSC) began collaborating to reimagine and restore Canterbury Brook and the wetlands at the Boston Nature Center. In August 2025, the City was awarded $400,000 in grant funding from the Commonwealth’s Municipal Vulnerability Preparedness (MVP) grant program to develop a feasibility study and conceptual design that re-naturalizes Canterbury Brook and revitalizes more than eleven acres of wetlands within the Boston Nature Center.
Together, the Project Team worked together to understand community needs and site conditions, assess stream and wetland health, and identify areas for restoration. A Conceptual Design Report was completed in July 2026 and included detailed information about the site’s history and existing conditions, a summary of the project’s community engagement efforts, and conceptual designs for the restoration and reintegration of the brook into an expanded shallow-pond, wetland complex, as well as an appendix of technical and historic documents, notes from interviews with Boston Nature Center staff, and project cost estimates.
Phase II: Schematic DesignIn August 2026, the City was awarded $370,408 through a second MVP grant to continue building upon the first phase of work. The second phase of work will involve further community engagement, additional site investigations and data review, baseline ecological monitoring and participatory science, schematic design for the Boston Nature Center wetlands, and design of a trash screening and pretreatment system at Canterbury Brookside to allow the removal of debris and sediment.
CONCEPTUAL DESIGN
PROJECT GOALS
- Restore Habitat and Biodiversity: Restoration will return natural flow paths and create a wide variety of habitats including a shallow open water pond, ephemeral pools, seasonally-flooded depressions, wet meadows, and upland refuges. By reducing erosion, replacing invasive plants with native species, and rebuilding the tree canopy, the project supports more than 150 bird species, 40 butterfly species, and 350 plant species found at the sanctuary.
- Reduce Flood Risk for Vulnerable Communities: Reconnecting the brook to its wetlands and floodplain will expand flood storage, and help the wetland to once again function as a sponge during extreme storms. This is essential for protecting the sanctuary and surrounding neighborhoods from recurring flooding.
- Improve Water Quality: Stormwater solutions will reduce sediment, trash, and pollutants in Canterbury Brook before they eventually flow into the Charles River.
- Enhance Public Access and Community Use: A revitalized brook and wetland will improve safety, expand recreational opportunities, support outdoor learning programs, and strengthen community stewardship. An improved, accessible trail system with new amenities will enrich the public experience of the sanctuary and Canterbury Brookside.
- Facilitate Maintenance: The project team will design the restored site so existing staff and programs can effectively maintain it.
COMMUNITY ENGAGEMENT
COMMUNITY ENGAGEMENTThe Charles River Watershed Association (CRWA) is leading the public engagement effort in close coordination with Mass Audubon, the City of Boston, and the design team. Engagement activities occurred both before and during development of the conceptual design, allowing community input to guide the project from its earliest stages through refinement of the proposed restoration alternatives. Community feedback informed decisions related not only to ecological restoration, but also to public access, educational opportunities, recreation, and the overall character of the restored landscape.
Community engagement will continue to be a priority during the schematic design process. In addition to achieving the project’s ecological and flood resilience objectives, the restoration intends to reflect the priorities and needs of the community.
A community meeting for the project was held on February 26, 2026. During this meeting, the project team introduced the project and held breakout sessions to collect input about aspects of the project that are important to the community.
The project team conducted a set of two focus groups on April 15, 2026 and April 23, 2026. These included a site walk and project overview, followed by small group discussion and mapping of ideas and desires for the site.
The team hosted a community clean-up and block party at the Brooke Charter School on April 24, 2026. This school sits in close proximity to the site.
The team organized a community art-making “Critter Creation” event at the BNC on June 7, 2026. A local artist, Carolyn Lewenberg, created paintable sculptures depicting wildlife that will benefit from the restoration project. Attendees decorated the sculptures with textures. Meanwhile, the team engaged with local families about the restoration project.
The team gathered place-specific input while tabling at community events and during project engagement activities. They recorded this input in an online Canterbury Brook Interactive Community Map for reference throughout the grant period.
PARTNERS
The project is possible through the collaboration of multiple public, non-profit, and private partners:
- The City of Boston procured funding and is managing the project.
- Mass Audubon plays a key role as the owner of the Boston Nature Center site in providing background information, vision, and guidance on the development of the design.
- The Charles River Watershed Association leads a robust, multilingual community engagement process, including walking tours, cleanups, surveys, and public meetings.
- The Boston Water and Sewer Commission provides guidance on the development of the design, particularly around issues related to stormwater and infrastructure management.
- Brown and Caldwell facilitates the development of the design and provides engineering analysis and expertise.
- The Massachusetts Division of Capital Asset Management and Maintenance (DCAMM), as the owner of the Canterbury Brookside portion of the project area, has shared background documents and provides invaluable input and feedback throughout the process.
- The Massachusetts Department of Transportation (MassDOT) has contributed by providing information on Morton Street and the associated culvert that crosses Canterbury Brook, as well as insight into potential future improvement considerations for the structure.
This project is shaped by years of advocacy from residents, gardeners, local organizations, and longstanding partners of the Boston Nature Center. The project’s ambitious goals would not be achievable without:
- The Boston Nature Center Sanctuary Committee, composed of local residents guiding priorities and concerns.
- The Clark Cooper Community Garden, with 100–200 community gardeners who have witnessed the brook’s deterioration firsthand.
- The Boston State Hospital Citizen’s Advisory Committee, the Greater Mattapan Neighborhood Council, the Mt. Hope Canterbury Neighborhood Association, Tree Boston, the Boston Food Forest Coalition, and many community members have supported the project in a variety of ways, including providing valuable input during engagement events.
GET INVOLVED
We need you!
- Share Feedback: Attend community meetings, share feedback, and help shape the project’s design.
- Stay Informed: Check out the Charles River Watershed Association for more information about engagement opportunities, and sign up for newsletter updates from the City of Boston’s Environment, Energy, and Open Space cabinet, CRWA, and Mass Audubon.
- Volunteer: Join future cleanups, planting days, youth programs, and stewardship events hosted by the Boston Nature Center and CRWA.
RESOURCES
RESOURCESAre you looking to learn more about Canterbury Brook and the Boston Nature Center?
First published in 2013, A Healing Landscape: Environmental and Social History of the Site of Mass Audubon’s Boston Nature Center by Scholar-in-Residence Steven Pavlos Holmes, PhD, tells the stories of the people who have lived and worked on the land over the past two centuries—including early farming families, a Revolutionary war soldier, pioneering birdwatchers, the residents and staff of the Boston State Hospital, and, of course, the Clark Cooper Community Gardens and Mass Audubon.
The expanded Second Edition (2016) features 34 pages of new material on the geological origins of the land, 10,000 years of Native American history, and the lives and work of farmers at the Boston State Hospital.